Case Study: Pacific Academy

In the Spring of 2011, Custom Air Conditioning went on a problem solving mission for Pacific Academy Preparatory School. The Heating/Cooling systems that were servicing the classrooms could not provide adequate and constant temperature or air flow. In addition, the systems being used were extremely noisy and took up valuable space in the classrooms. Through interfacing with the systems in place, we provided a Custom solution that solved all of their problems. Based around a Heat Pump system, our solution maximized efficiency by providing temperature control, eliminating noise disruption, and allowing for more convenient maintenance. The solution designed and implemented by Custom was on a “don’t pay until satisfied” basis. The result has been extremely positive for all those using the system, and this solution has now been committed to the rest of the school.